THE PRIME MINISTER | THE SOCIALIST REPUBLIC OF VIETNAM |
No. 236/QD-TTg | Hanoi, February 14, 2007 |
DECISION
ON APPROVAL FOR MASTER PLAN FOR NGHI SON ECONOMIC ZONE DEVELOPMENT
THE PRIME MINISTER
Pursuant to the Law on Government organization dated December 25, 2001;
Pursuant to the Law on Construction dated November 26, 2003;
In consideration of requests in the Document No.06/TTr-BXD dated January 19, 2007 by the Minister of Construction and the Document No.4698/UBND dated November 06, 2006 by the People’s Committee of Thanh Hoa.
HEREBY DECIDES
Article 1. To approve the master plan for development of Nghi Son Economic Zone, Thanh Hoa province (hereinafter referred to as “Nghi Son EZ”) by the year 2015 as follows:
...
...
...
Nghi Son EZ with the total area of 18,611.8 ha covers 12 communes of Tinh Gia district, Thanh Hoa province. The boundary is defined as follows:
- Adjacent to Nguyen Binh and Binh Minh communes, Tinh Gia District, Thanh Hoa Province to the North.
- Adjacent to Quynh Luu district, Nghe An province to the South.
- Adjacent to China sea to the East.
- Adjacent to Nhu Thanh district, Thanh Hoa province to the West.
2. Characteristics:
- Nghi Son EZ is an integrated economic zone specializing in various fields and sectors such as industry – commerce - service – tourism – agro- forestry and fishery:
+ Key industries: oil refining, petrochemical industry and chemical industry;
+ Large-scale industries: steel industry, mechanics, automotive industry, shipbuilding, electricity, building materials, consumer goods, processing and exportation, and other industries and services in relation to Nghi Son deep-water ports.
...
...
...
3. Population projection:
- By 2015: Approximately 140,000 people
- By 2025: Approximately 200,000 people
4. Functional areas:
a) Non-tariff zones (approx. 500 ha)
b) Tariff zones (approx. 18,100 ha) including the following subzones:
- Residential subzones
+ In the East of the national highway 1A: define the boundary and scale of new urban complexes and existing residential areas for renovation, enhance technical infrastructures and invest in social infrastructure to meet the modern urban standards and remain standard distance from the oil refinery;
+ In the West of the national highway 1A: construct new urban complexes for relocation, site clearance, worker accommodation, rural areas, ecological tourist attractions and other functional sub-zones.
...
...
...
- Industrial sub-zones
+ In the East of the national highway 1A: cover a total industrial land area of 2,050 ha including seaports (500 ha); petrol industry clusters (450 ha), Nghi Son 1 and Nghi Son 2 (300 ha); cement plants with the capacity of 4.3 million tonnage/year (110 ha), shipbuilding area (100 ha), thermal plants in the South (350 ha) and small-scale industry area (240ha);
+ In the West of the national highway 1A: cover an agricultural land with the area of 1,050 ha including Cong Thanh cement cluster with the capacity of 2.8 million tonnage per year ( approx. 50 ha); warehouses, areas for building material production and new industry in Truong Lam commune (1,000 ha).
- Resorts for health tourism, marine tourism, rural tourism and sightseeing tourist attractions.
- Ecological sub-zones including green parks, protection forests, coastal plants and landscape buffers.
- Functional sub-zones including shopping malls in bonded warehouse areas and urban complexes; and vocational schools.
c) Key technical infrastructures including existing technical infrastructures and expected infrastructures needing for The Nghi Son EZ development such as: Nghi Son deep-water ports, dedicated ports for cement plants and oil refineries and petrochemical plants, and integrated ports; civil airports, works for water and electricity supply, waste water treatment plants, solid waste treatment plants, etc.
5. Technical infrastructures planning:
The technical infrastructure shall be constructed according to the development objectives and standpoints to meet the population demands and ensure urban landscape, safety and environmental sanitation. To be specific:
...
...
...
- External traffic systems:
+ Dedicated ports for cement plants and oil refineries and petrochemical plants, integrated ports and fishing ports shall be constructed in accordance with the port planning by the Ministry of Transport;
+ National roads and railways shall be constructed to connect The Nghi Son EZ with Ho Chi Minh highway. The civil airport shall be located in the South of Thanh Hoa province.
- Traffic systems in Nghi Son EZ:
the traffic network shall be completed in accordance with the approved planning for The Nghi Son EZ development; and waterways on Bach Lang river and trunk roads in the Economic Zone shall be studied.
b) Oil pipelines:
The location of oil pipelines shall be determined and shall satisfy technical requirements, fire, and explosive and environment safety under the regulations of laws.
c) Construction site preparation:
- Determine reasonable height clearance of construction areas.
- Study proposed measures against Acts of God; determine safety distance of coastal works.
...
...
...
d) Water supply: propose measures for protecting water in Yen My and Dong Chua lakes
dd) Electricity supply: use electricity from national grids, propose electrical lines and power stations according to the development period of the Economic zone.
e) Drainage and urban environmental sanitation:
- Propose the drainage and environmental sanitation measures for minimizing the environmental, soil and air pollution.
- Determine the location and scale of wastewater treatment plants and solid waste treatment plants, cemeteries and burial technologies; propose drainage networks and environmental protection measures.
- Propose modern technologies for solid waste treatment and industrial/municipal wastewater treatment on the basis of effectiveness according to natural terrain and landscape.
g) Telecommunication infrastructures: synchronize and modernize the infrastructures and ensure that it satisfies the international standards.
6. Planning documents:
Documents on the planning for The Nghi Son EZ development by 2025 shall be made in accordance with the Government’s Decree No.08/2005/ND-CP on construction dated January 24, 2005 and the Circular No.15/2005/TT-BXD guiding the formulation, assessment and approval for the construction planning dated August 19, 2005.
...
...
...
- 02/2007: Approval for the master plan draft.
- From 02/2007 to 06/2007: Completion of assessment documents and reports
- 08/2007: Submission for approval for the final master plan.
Article 2. Implementation organizations
- Governing authority: Nghi Son EZ management board
- Planning-making authority: Nghi Son EZ management board
- Assessing authority: Ministry of Construction
- Applicants: Ministry of Construction and People’s Committee of Thanh Hoa province
- Approval authority: The Prime Minister
...
...
...
- Formulate plans for The Nghi Son EZ development by the year 2025.
- Introduce the construction management regulations and carry out the construction of The Nghi Son EZ in accordance with the approved plan.
Article 4. This Decision enters into forces after 15 days from the date of its signature.
The Minister of Construction, Minister of Development and Planning, Minister of Finance, Minister of Commerce, Heads of Ministerial-level agencies, Heads of Governmental agencies, the President of the People’s Committee’s of Thanh Hoa province and relevant entities shall be responsible for the implementation of his Decision./.
PP. THE PRIME MINISTER
DEPUTY MINISTER
Nguyen Sinh Hung
- 1Decision No.1076/QD-TTg of August 20, 2007 approving the master plan on construction of Vung Ang economic zone, Ha Tinh province up to 2025
- 2Decision No. 1056/QD-TTg of August 16, 2007, approving the master plan on the construction of Dung Quat economic zone, Quang Ngai province up to 2020.
- 3Decision No. 102/2006/QD-TTg of May 15, 2006, on the establishment of Nghi Son economic zone, Thanh Hoa province, and the promulgation of its operation regulation.
Decision No. 236/QD-TTg dated February 14th, 2007, on approval for master plan for Nghi Son economic zone development
- Số hiệu: 236/QD-TTg
- Loại văn bản: Quyết định
- Ngày ban hành: 14/02/2007
- Nơi ban hành: Thủ tướng Chính phủ
- Người ký: Nguyễn Sinh Hùng
- Ngày công báo: Đang cập nhật
- Số công báo: Đang cập nhật
- Ngày hiệu lực: 01/03/2007
- Tình trạng hiệu lực: Đã biết